Sfida
Ceiling void space was extremely limited above pediatric ICU rooms, with mechanical, electrical, medical gas and fire protection systems all competing for the same routing corridors.
Healthcare · MEP Modeling
A dedicated pediatric care wing with high-density mechanical and medical gas infrastructure, modeled to fabrication-ready LOD 400 with a fully clash-free result confirmed before install.

Project Overview
Key facts about scope, delivery and the software used to model this project.
Country
Germany
Industry
Healthcare Facilities
Building Size
18,600 sq. m
Level of Detail
LOD 400
Completion Year
2024
Client
Anchorpoint Medical Trust
Project Duration
11 weeks
Software Used
Project Story
How we approached the scan-to-BIM workflow for Children's Hospital Wing — Clash-Free MEP.
Sfida
Ceiling void space was extremely limited above pediatric ICU rooms, with mechanical, electrical, medical gas and fire protection systems all competing for the same routing corridors.
Soluzione
We modeled every system to fabrication-ready detail directly in the constrained ceiling void, resolved routing conflicts discipline by discipline, and delivered CADmep-ready duct and pipe detailing for the install crews.
Results
18,600 sq. m
Wing Area Modeled
5 Systems
Coordinated in Ceiling Void
0
Clashes at Fabrication Handover
11 Weeks
Design to Fabrication
Gallery
Five views of the building context, site conditions, and coordination environment for Children's Hospital Wing — Clash-Free MEP.
© BIMZ Studio. Portfolio images and project materials are protected and may not be reproduced, downloaded, distributed, or reused without prior permission. Browser screenshots cannot be completely prevented; displayed images are optimized, watermarked derivatives.
Explore More
More coordinated BIM projects from our portfolio you might find useful.
United StatesHealthcare Facilities
A new patient care wing tying into an operating regional medical center, modeled to LOD 400 with full MEP coordination so infection-contr…
United StatesCommercial Real Estate
A 42-story mixed-use tower combining retail podium, office floors and residential levels, converted from multi-scan laser survey data int…
United KingdomCommercial Real Estate
A two-wing corporate campus with a shared central atrium, coordinated across mechanical, electrical and plumbing systems to resolve routi…
Send your design documents and receive a fixed-price MEP proposal within 24 hours.
Contact
Reach out directly, or upload your point cloud above to get a scoped proposal within 24 hours.
Global Delivery
Remote-first, serving clients worldwide
Lingua