Built From Cleared Models
Sheets are extracted after clash resolution so shop geometry matches the coordinated design.
Documentation · Fabrication & Install
We produce discipline shop drawing packages from clash-cleared BIM — with dimensions, tags, assemblies and notes fabricators and installers need to build correctly the first time.


Problem Statement
Contractors need discipline-specific shop drawings with dimensions, tags, assembly details and installation notes — not generic plans. Gaps between coordinated models and shop sets cause fabrication delays and site rework.
Our Solution
After coordination clearance, we produce shop drawing packages for MEP, structure or architectural assemblies with the sheets, schedules and callouts fabricators and installers expect.
Fabrication Sheets
Post-Coordination
Schedules & Tags
PDF + DWG Delivery
Benefits
Shop sets that follow coordination — not outdated design drawings that ignore site conflicts.
Sheets are extracted after clash resolution so shop geometry matches the coordinated design.
MEP, structural or architectural packages with the callouts each trade expects.
Equipment, door, window or spool schedules generated from the same model source.
Title blocks, layers and annotation styles matched to contractor or GC requirements.
Clouded revisions and issue logs keep fabricators on the current set.
Workflow
From coordinated model to issued shop package with clear revision control.
Trade scope, sheet list, standards and fabrication LOD are confirmed with your team.
We verify the source model is coordination-cleared and suitable for shop extraction.
Sheet index, naming, tagging rules and issue schedule are locked before drafting.
Plans, sections, details and schedules are authored from the coordinated model.
Dimension, tag and consistency checks run before issue to fabrication.
PDF/DWG packages issue with revision history and optional native sheet models.
Deliverables
Shop packages your fabricators can price, cut and install from.
Issued sheets with revisions, stamps and sheet index.
Editable CAD files matching the issued PDF set.
Optional RVT/Archicad sheet files for ongoing updates.
Equipment or assembly schedules linked to sheet references.
Sign-off list covering dimensions, tags and coordination status.
LOD Support
We model to the LOD your project stage requires — from early massing through fabrication-ready and as-built documentation.
LOD 350
Interfaces with adjacent systems defined for multi-discipline clash coordination.
LOD 400
Detail sufficient for fabrication, assembly and construction documentation.
Software Used
Industry-standard authoring and QA software, chosen to match how your team already works.
Autodesk Revit
Sheet extraction and parametric detailing.
AutoCAD
CAD detailing and DWG delivery.
Autodesk Navisworks Manage
Coordination status verification.
Graphisoft Archicad
Archicad-based shop documentation when required.
Industries
The same coordinated, QA-checked modeling pipeline, tailored to each sector's compliance and detail requirements.
UK · USA · EUCoordinated Revit and Archicad delivery for HQ campuses, towers, and mixed-use schemes across London, New York, and major EU business districts.
Sweden · USA · UKHigh-detail clinical BIM for hospitals and medical campuses in Northern Europe and the United States, built around live-operation constraints.
Germany · NL · USAProcess-plant and manufacturing models with constructible MEP outcomes for facilities in Germany, the Netherlands, and the US Midwest.
UK · NL · USACampus and academic facility BIM for universities and research estates in the UK, Netherlands, and the United States.
FAQ
Answers to what teams most often ask before starting a shop drawings project.
We prefer a coordinated model. If you only have CAD, we can discuss a modeling-first path before shop production.
Common packages include HVAC, piping, electrical, fire protection, structural steel and architectural assemblies.
Strongly recommended. Issuing shop sets from uncleared models transfers coordination risk to fabrication.
Related Services
Pair this service with adjacent capabilities for a complete Scan to BIM, coordination and handover pipeline.

Documentation
Construction-ready drawings, sheets and schedules extracted from coordinated BIM.
Explore Drafting & Documentation
MEP & Coordination
Coordinated mechanical, electrical and plumbing models engineered for install.
Explore MEP Modeling
MEP & Coordination
Multi-discipline clash detection and coordination before construction starts.
Explore Clash Detection
Scan to BIM
Native parametric Revit models built directly from registered point cloud data.
Explore Point Cloud to Revit
Scan to BIM
Verified as-built BIM models reflecting installed conditions for handover and FM.
Explore As-Built BIM
Facility & IFC
OpenBIM IFC exchange models structured for coordination, handover and interoperability.
Explore IFC BIMShare your coordinated model and sheet list for a fixed-scope shop drawing proposal within 24 hours.
Yes. Provide your template and we align sheet standards before production.
Most trade packages issue in 5–10 business days after model clearance and sheet-list approval.
Contact
Reach out directly, or upload your point cloud above to get a scoped proposal within 24 hours.
Global Delivery
Remote-first, serving clients worldwide
Langue